It seems I wildly overestimated the time it would take to complete step two. (Especially if I ended up stuck at home with the stomach flu!)
The first 9' section of mottoe applique is finished. That piece is the section which will go over the front doorway just above the AIR and FIRE panels. After some elaborate calculations I have figured out where the text will fall on the 9' section over the back door, marked out the text, and started the applique work there too.
I hope to have both doorways finished by the end of this weekend, if all goes well.
The finished section of Mottoe
The second section
To give a better idea of the scale/construction of the Pavilion here is a photo of: the roof, mottoe and doorway panels laid out as they will be assembled
and finally, a picture of the source design for the dragon on the front roof of the pavilion
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment